March, Cambridgeshire

Permanent Highways Retaining Wall with a vibratory leader rig

Fussey Piling was invited to tender for a sheet pile highway retaining wall project in Cambridgeshire.

However, these ArcelorMittal AZ sheet piles have been installed in July! on a site in March, Cambridgeshire.

The 100m run of 8m long AZ sheet piles have been driven in less than 4 days with our powerful Bauer RTG 16T telescopic leader rig supported by our Sennebogen 630 crane.

Upon completion of the sheet piling our sister company, Fussey Engineering limited, installed a pressed steel capping beam to finish of the wall.