Client Coinford Construction Ltd Contractor Fussey Piling Limited Location Battersea Bridge Road, London, UK Scope Permanent watertight steel intensive basement wall Piles Arcelor Mittal PU18-1mm, PU22-1mm, in lengths 7.5m to 10.0m in Grade S355GP Ground Conditions Dense sands over stiff London clay Value £240k approx This project involved the construction of nine new dwellings and a basement car park...

Client John Sisk and Sons Contractor Fussey Piling Location Wembley Piles PU18-1mm, PU22-1mm and PU28-1mm in lengths 7.0 to 12.0m Ground Conditions Made ground over London Clay Value £52,000 The project involved the redevelopment of the site by the construction of a 9-10 storey block of flats, incorporating a basement.  Fussey Piling were contracted by John Sisk...

Client Giggs Hill Homes Contractor Fussey Piling Limited Location Thames Ditton, Surrey, UK Piles 290No. Arcelor PU22-1mm 9.5 to 11.0m long in Grade S355GP Ground Conditions Gravelly Sand over London Clay Value £350k approx Fussey Piling Limited (01608 659595) have recently completed the first stage of a steel intensive basement for Giggs Hill Homes in Thames Ditton,...

Client Orchards of London Ltd Contractor Fussey Piling Limited Location Birch Grove, Ealing Scope Temporary sheet piled cofferdam on a tight site Piles 8.5m PU18-1mm to 10.0m PU22-1mm Ground Conditions Made ground, over sand and gravel, overlaying London clay Value £60,000 approx after extraction The project involved the redevelopment of a disused brown field site by the construction of...

Client Walter Lilly & Co Ltd Contractor Fussey Piling Limited Location Wentworth Scope Temporary sheet piled retaining wall Piles PU22-1mm and PU22+1mm in lengths 9.0m to 11.0m Ground Conditions River Terrace Deposits to a depth of 3m, over Bagshot Beds Value £90,000 approx The project involved the demolition of existing structures at the site and the construction of a...

Temporary sheet piling for a river retaining wall with a Leader Rig Topbond plc appointed Fussey Piling to install and extract some temporary sheet piles to enable the construction of a new river retaining wall. The former industrial site close to Pudding Mill Lane station is...

A Silent and Vibration-free Permanent Sheet Piled Cofferdam Retaining Wall This sheet piling project in Richmond, Surrey is for a private individual who was looking to build his dream property for his family. We were invited early on in the design development stage, as a specialist...