Tel: 01608 659595 | mail@fusseypiling.com
Fussey Piling is one of the country’s leading sheet piling specialists. As a piling contractor working all over the mainland UK we offer all types of steel pile driving techniques.
We offer advice for your particular sheet piling scheme and speedily complete preliminary design work to assist with budgeting. Once the scheme has been developed we can fully design, specify and provide competitive quotations for permanent works, temporary works, or temporary sheet piles that may be left in. Similarly we can provide a range of sheet pile sealants to provide short term to permanent fully sealed walls, cofferdams and basements.
We also specialise in restricted access city centre type sites and steel intensive basements. As well as installing sheet piles on the more traditional construction sites. Sheet piles provide very quick, economic and convenient construction methods compared to contiguous and secant walls.
If you are looking for steelwork or fabrication please contact our sister company Fussey Engineering.
Why use Fussey Piling?
What can Fussey Piling offer?
Fussey Piling own and operate the latest technology in virtually silent and vibration-free sheet pile installation.
Fussey piling own and operate the latest technology in telescopic leader rig vibratory sheet pile installation.
Conventional/Traditional piling is undertaken using crane suspended piling vibrators or hydraulic drop hammers.
Fussey Piling use ArcelorMittal steel sheet piles and have over 1,000 tonnes of stocks available.
Kai Koh, Barratt London
Alexander Belcher, John Sisk & Son Ltd
Jon Davies, Benniman
Fussey Piling, a UK specialist sheet piling contractor, was awarded the first part of multi-phase project to install the sheet piles for the prestigious new stadium in North London. The Advanced Stadium Works contract was awarded directly by the club.
They say what goes up must come down. In sheet piling, sometimes what goes in must come out! One of the things about sheet piling as a flexible retaining wall system is that piles can easily be recovered once the structure has been built and the area back-filled.
On this project we had to install a 180m run of 8.0m Z piles to form a temporary, left in, sheet pile retaining wall directly in front of an existing concrete retaining wall. The new warehousing development required the back of the site to be lowered by approximately 2.5m.
Kingham office: 01608 659 595
Graham Hall: 07801 529 880 (Director)
David Jones: 07801 529 873 (Director)
Tracey Learoyd: 07801 529875 (Office Administration Lead)
Ben Jones: 07501 728 274 (Operations Manager)
David Savile: 07825 567 569 (Design Team)