Pre-Augered Archives - Fussey Piling
-1
archive,tax-portfolio_category,term-pre-augered,term-71,bridge-core-2.9.6,qode-page-transition-enabled,ajax_fade,page_not_loaded,,hide_top_bar_on_mobile_header,qode-theme-ver-28.0,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-6.7.0,vc_responsive
 

Archive

Client Coinford Construction Ltd Contractor Fussey Piling Limited Location Battersea Bridge Road, London, UK Scope Permanent watertight steel intensive basement wall Piles Arcelor Mittal PU18-1mm, PU22-1mm, in lengths 7.5m to 10.0m in Grade S355GP Ground Conditions Dense sands over stiff London clay Value £240k approx This project involved the construction of nine new dwellings and a basement car park...

Client Walter Lilly & Co Ltd Contractor Fussey Piling Limited Location Wentworth Scope Temporary sheet piled retaining wall Piles PU22-1mm and PU22+1mm in lengths 9.0m to 11.0m Ground Conditions River Terrace Deposits to a depth of 3m, over Bagshot Beds Value £90,000 approx The project involved the demolition of existing structures at the site and the construction of a...

Client Hill Partnerships Contractor Fussey Piling Limited Location Station Road, Cambridge, UK Scope Temporary sheet piled cofferdam Piles 550No. Arcelor Mittal PU18-1mm, PU22-1mm, PU22+1mm and PU28-1mm in lengths 7.0m long to 12.0m in Grade S355GP Ground Conditions Dense gravels over stiff clay Value £320k approx The CB1 Development in Cambridge consisted of the construction of new residential, retail and...

Permanent sheet piled basement cofferdam retaining wall with a silent and vibration-free rig Fussey piling was working once again with Metnor to produce a permanent sheet piled basement cofferdam retaining wall for a new care home facility in Chester. Whilst the ground conditions indicated favourable driving conditions...

A Silent and Vibration-free Permanent Sheet Piled Cofferdam Retaining Wall This sheet piling project in Richmond, Surrey is for a private individual who was looking to build his dream property for his family. We were invited early on in the design development stage, as a specialist...