Temporary Sheet Piled Retaining Wall at Wentworth
16068
portfolio_page-template-default,single,single-portfolio_page,postid-16068,bridge-core-2.9.6,qode-page-transition-enabled,ajax_fade,page_not_loaded,,hide_top_bar_on_mobile_header,qode-theme-ver-28.0,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-6.7.0,vc_responsive
 

Wentworth

About This Project

Client
Walter Lilly & Co Ltd

Contractor
Fussey Piling Limited

Location
Wentworth

Scope
Temporary sheet piled retaining wall

Piles
PU22-1mm and PU22+1mm in lengths 9.0m to 11.0m

Ground Conditions
River Terrace Deposits to a depth of 3m, over Bagshot Beds

Value
£90,000 approx

The project involved the demolition of existing structures at the site and the construction of a new residential property, including a basement. Fussey Piling were appointed by Walter Lilly & Co Ltd to design, install and later extract two retaining walls, including temporary propping, to facilitate the construction of the basement. Our contract was worth approximately £90,000.

The ground conditions encountered were River Terrace Deposits to a depth of 3m, over Bagshot Beds (Firm to Stiff clays with dense sands).

Fussey Piling first pre-augured the ground using a Bauer RTG RG 16T Telescopic Leader Rig fitted with a MB50 Auger Motor. This process loosened the densest of the sands, alleviating the risk of the piles refusing in the dense granular soils.

The sections used varied between 9.0m PU22-1mm to 11.0m PU22+1mm piles grade S355GP, retaining a maximum height of 4.5m. The sections were installed using the RTG rig which uses a variable moment high frequency vibrator to vibrate the piles to the level required.

At a later date the piles were extracted using Kowan WP150 Stillworker.

Category
Bauer RTG 16T Leader Rig, Kowan WP-150 Stillworker, Pre-Augered, Sheet Piling