Permanent Highways Retaining Wall with a vibratory leader rig
Fussey Piling was invited to tender for a sheet pile highway retaining wall project in Cambridgeshire.
However, these ArcelorMittal AZ sheet piles have been installed in July! on a site in March, Cambridgeshire.
The 100m run of 8m long AZ sheet piles have been driven in less than 4 days with our powerful Bauer RTG 16T telescopic leader rig supported by our Sennebogen 630 crane.